Accelerating Climate Efforts and Investments (ACE) project supports the objectives of the LIFE program by strengthening capacities, encouraging investments, developing, demonstrating, and promoting innovative climate change mitigation solutions, participating in the creation of a knowledge base, and disseminating and applying best practices. The project’s most significant positive environmental impacts result from the ACE LIFE consortium’s low-carbon investments, which target low-emission logistics and machinery, electrification of industrial processes, and the development of plant-based protein and peat production value chains.
The tender processes carried out within the ACE LIFE project adhere to the principles of fairness, transparency, and equality. Thanks to a non-discriminatory approach, bids are evaluated based on their merits and their alignment with the stated requirements.
This page will announce the project’s upcoming, ongoing, and past procurements.
Investments and purchases above 10 000 eur
Suomen ympäristökeskus (Syke)
Purchase or investment |
Sum (€) |
Status |
Costs of organising project events (venue and catering) |
60 000 |
Ongoing |
Project promotion materials |
15 000 |
Ongoing |
Translation and language checking of project materials |
30 000 |
Ongoing |
Audit of cost statements for all beneficiaries with budget over audit limit |
30 000 |
Upcoming |
Graphic and visual design and products |
20 000 |
Ongoing |
Cases: concept and production |
100 000 |
Upcoming |
Capacity building meetings |
15 000 |
Upcoming |
Transition arena tools and materials |
10 000 |
Upcoming |
Capacity building platform |
10 000 |
Upcoming |
Data purchasing |
10 000 |
Upcoming |
Luonnonvarakeskus (Luke)
Purchase or investment |
Sum (€) |
Status |
Organising project events (venue and catering) |
60 000 |
Upcoming |
Project promotion materials |
27 000 |
Upcoming |
Dams and other items for rewetting |
177 583 |
Upcoming |
Service for making rewetting plans, services for the greenhouses |
41 000 |
Upcoming |
Services for digestion studies |
10 000 |
Upcoming |
Lappeenrannan-Lahden Teknillinen Yliopisto (LUT)
Purchase or investment |
Sum (€) |
Status |
Open access publication costs |
10 000 |
Upcoming |
Itä-Suomen yliopisto (UEF)
Purchase or investment |
Sum (€) |
Status |
Costs of organising project events |
28 000 |
Upcoming |
Publication costs |
10 500 |
Upcoming |
Oyj Ahola Transport Abp (Ahola)
Purchase or investment |
Sum (€) |
Status |
HUB area planning |
25 000 |
Upcoming |
Heavy transport fast charger |
150 000 |
Upcoming |
Heavy transport maintaining charger |
50 000 |
Upcoming |
Cables and transformers |
390 000 |
Upcoming |
Pilot electric truck
|
270 000 |
Completed |
Pilot biogas long-haul truck |
150 000 |
Upcoming |
HUB Infra arrangement |
60 000 |
Upcoming |
Communication material: promo video |
11 250 |
Upcoming |
Promotion events and material |
15 000 |
Upcoming |
Training services for operational staff |
10 000 |
Upcoming |
Electricity supply connection and electrical capacity allocation |
145 000 |
Upcoming |
Installations of chargers, transformers, piping etc. |
40 000 |
Upcoming |
Linkosuon Leipomo Oy (Linkosuo)
Purchase or investment |
Sum (€) |
Status |
Technical design expertise to define implementation and integration details of the equipment |
50 000 |
Upcoming |
Investment to replace oil and natural gas with electricity in the food production process |
618 000 |
Upcoming |
Kajaanin Romu Oy (KR)
Purchase or investment |
Sum (€) |
Status |
Electric-powered excavator for material handling in scrap yard |
307 008 |
Upcoming |
Communication and project management |
49 000 |
Upcoming |
Emission and energy consumption metering, result verification etc. |
17 900 |
Upcoming |
Kiteen Mato ja Multa Oy (KMM)
Purchase or investment |
Sum (€) |
Status |
Spare parts for grinding machine diesel replacement with electric/clean gas/hybrid devices |
10 000 |
Upcoming |
Packaging line |
100 000 |
Upcoming |
Machine parts (electric control board) |
30 000 |
Upcoming |
Renting material cutting machinery (150 ha) |
150 000 |
Upcoming |
Covering extra processing costs |
30 000 |
Upcoming |
Raw material (reed biomass for growing media) |
80 000 |
Upcoming |
Material transport costs |
35 000 |
Upcoming |
Storage renting costs |
25 000 |
Upcoming |
Laboratory service |
20 000 |
Upcoming |
Plugit Finland Oy (Plugit)
Purchase or investment |
Sum (€) |
Status |
Specification and planning of the low-emissions energy ecosystem |
50 000 |
Upcoming |
Energy Storage, BMS and related prototyping procurement |
290 000 |
Upcoming |
V2G (Vehicle to Grid) specific hardware & components |
60 000 |
Upcoming |
Project reporting, publishing and media distribution |
10 000 |
Upcoming |
Structural and electrical engineering task costs for pilot systems |
100 000 |
Upcoming |
Metsäliitto Osuuskunta (Metsä Group)
Purchase or investment |
Sum (€) |
Status |
Electric charging infrastructure design and planning |
50 000 |
Upcoming |
Transparent real time reporting of CO2 emissions (ICT modifications) |
50 000 |
Upcoming |
eLearning for transporters |
20 000 |
Upcoming |
Piloting non-fossil power options in terminals, transport services and in forestry machines |
100 000 |
Upcoming |
High-capacity electric charging stations and installation |
300 000 |
Upcoming |
Liikenne- ja viestintävirasto (Traficom)
Purchase or investment |
Sum (€) |
Status |
Supporting studies and reports, e.g. hydrogen economy and possible technical testing |
100 000 |
Upcoming |
Costs of organising events, webinars and podcasts |
50 000 |
Upcoming |
Newsletters, videos and animations |
10 000 |
Upcoming |
Maailman Luonnon Säätiö - World Wide Fund For Nature (WWF)
Purchase or investment |
Sum (€) |
Status |
Costs of organising stakeholder events |
25 000 |
Upcoming |
Production of campaign materials and tools on sustainable diets |
60 000 |
Upcoming |
Communication costs |
102 800 |
Upcoming |
Surveys on food behaviour |
10 800 |
Upcoming |
Stora Enso OYJ (Stora)
Purchase or investment |
Sum (€) |
Status |
Piloting electric trucks |
50 000 |
Upcoming |
Piloting electric terminal machinery |
50 000 |
Upcoming |
External service providers for contractor trainings |
50 000 |
Upcoming |
External IT work, integrations to Stora Enso IT-systems from contractor applications |
50 000 |
Upcoming |
Costs of organising project events (venue and catering), training/info sessions |
15 500 |
Upcoming |
Project promotion materials |
15 000 |
Upcoming |
Elinkeino-, liikenne- ja ympäristökeskusten sekä työ- ja elinkeinotoimistojen kehittämis- ja hallintokeskus (KEHA)
Purchase or investment |
Sum (€) |
Status |
Climate impact evaluation web tool |
34 000 |
Upcoming |
Costs of organising project events |
11 000 |
Upcoming |
Pohjaset Oy (Pohjaset)
Purchase or investment |
Sum (€) |
Status |
Real-time emission reporting, IT system development |
15 000 |
Upcoming |
Pohjaset Logistics Oy (POHLOG)
Purchase or investment |
Sum (€) |
Status |
Electric truck & trailer for roundwood |
400 000 |
Upcoming |
Installations and adjustments of truck and trailer |
20 000 |
Upcoming |
UPM-KYMMENE OYJ (UPM)
Purchase or investment |
Sum (€) |
Status |
Purchasing electric forklifts to replace gas forklifts |
130 000 |
Upcoming |
Construction needed for electric forklift charging infrastructure on a nursery production site |
70 000 |
Upcoming |
Electric charging infrastructure for forklifts with solar power |
120 000 |
Upcoming |
Electric charging infrastructure for one of the UPM's mill site |
120 000 |
Upcoming |
Tuoretie Oy (Tuoretie)
Tiina and Antti Herlin Foundation sr (TAH)
Purchase or investment |
Sum (€) |
Status |
Costs of organising project events |
22 000 |
Upcoming |
Project promotion materials and publications |
10 000 |
Upcoming |
Metsäteho Oy (Metsäteho)
Purchase or investment |
Sum (€) |
Status |
Costs of organising project events |
20 000 |
Upcoming |
Project promotion materials |
15 000 |
Upcoming |
Development and maintenance of web page and other dissemination material |
20 000 |
Upcoming |
Ministry of the Environment (MoE)
Purchase or investment |
Sum (€) |
Status |
Renting of meeting/conference spaces |
10 000 |
Upcoming |
Toijala Works Oy (Toijala Works)
Purchase or investment |
Sum (€) |
Status |
EMC-tests and electrical approvals |
20 000 |
Upcoming |
Documentation (user manuals, spare part books etc) |
15 000 |
Upcoming |
Software design, machine controls |
75 000 |
Upcoming |
Hydraulic system design |
50 000 |
Upcoming |
Electrical design and consultation for driving system |
15 000 |
Upcoming |
Metsähallitus Metsätalous Oy (Metsähallitus)
Purchase or investment |
Sum (€) |
Status |
Piloting electric and/or biogas services for forestry, harvesting and transporting; biogas car |
60 000 |
Upcoming |
Piloting electric and/or biogas services for forestry, harvesting and transporting; forestry and harvesting machinery |
100 000 |
Upcoming |